ENGINEERING • SUPPLY • INSTALLATION

Ceramic Hall of Fame

2010 Р Installed technological & mep systems with a turn-key solution for a first-rate sanitaryware company.

2013 – Completing a 130m lehgth fast tunnel dryer for clay pipes. Structure is longer than a soccer field!

2014 – All new plant Dryers & casting hall controls work with hot water tecnology and energy recovery.

2015 – Installed the best Predryer control ever with homogeneous air distribution.

IMAG4625

 

Author: adminpplant

Share This Post On